Assessment Task 2 of ICTNWK517
© MILCOM Communications Pty Ltd trading as MILCOM Institute | RTO No. 6859 | CRICOS Provider Code:03491G
Head Office: Unit 12/1866 Princes Highway Clayton VIC 3168 | Phone: 1300 369 320 |Email: [email protected]
Assessor Resource Task for ICTNWK517| v 1.0 | Last reviewed: May 2019 | Not controlled when printed Page 1 of 4
Assessment Task 2 of ICTNWK517
This document is WAN Specification Assessor. It is part of the supporting resources
WAN Specification Template
Existing LAN
Provide a description of the current LAN that is in place in each office.
Required LAN, WLAN and VPN segments
Outline the required LAN, WLAN and VPN segments for the proposed WAN, ensuring you
provide diagrams of such. Make sure you identify the segment, as well as what should be
included in each segment (use screen shots to show your proposed segments). You may use
the table below.

Device/software Resource type Segment/level Functions
AssignmentTutorOnline

Physical environment and WAN
Explain how the company’s physical environment impacted on the WAN design created.
Bandwidth required
Your estimate of the bandwidth required according to the scenario information and based
on expected traffic content and volume. You should also include the download and upload
speed required.
WAN components
An outline of the various components of the proposed WAN network and that includes the
device/software, resource type, segment/level and functions. Use the table below.

Device/software Resource type Segment/level Functions
© MILCOM Communications Pty Ltd trading as MILCOM Institute | RTO No. 6859 | CRICOS Provider Code:03491G
Head Office: Unit 12/1866 Princes Highway Clayton VIC 3168 | Phone: 1300 369 320 |Email: [email protected]
Assessor Resource Task for ICTNWK517| v 1.0 | Last reviewed: May 2019 | Not controlled when printed Page 2 of 4
Vendor options and costs
Vendor options and costs for each of the components you are proposing (include at least
three options).

Product Description Quantity Unit price (ex.GST) Segment
WAN Design
An outline of the most appropriate WAN design taking into account budget considerations,
reliability and bandwidth.
Design for Redundant Links
A design for redundant links in the proposed WAN connectivity for link backup purposes, in
case the main link is disrupted.
IP Addressing Scheme
Include IP addressing scheme.

ICTNWK517 Assessment Task 2
MILCOM Communications Pty Ltd trading as MILCOM Institute | RTO No. 6859 | CRICOS Provider Code:03491G Head Office: Unit 12/1866 Princes Highway Clayton VIC 3168 | Phone: 1300 369 320 |Email: [email protected] MILCOM Communications Pty Ltd trading as MILCOM Institute | RTO No. 6859 | CRICOS Provider Code:03491G

ICTNWK517 Assessor Resource Task | v 1.0 | Last updated: May 2019 | When printed, there is no control. 1st of 4 pages

ICTNWK517 Assessment Task 2

WAN Specification Assessor is the name of the document. It’s a part of the supplementary materials.

Template for WAN Specification

LANs that already exist

Give a brief summary of the present LAN setup at each office.

LAN, WLAN, and VPN parts are all required.

Make a list of the required LAN, WLAN, and VPN segments for the planned WAN.

Provide examples in the form of diagrams. Make sure you know what the segment is and what it should be.

each segment includes (use screen shots to show your proposed segments). You may make use of

the table that follows.

Type of device/software resource

Segment/level Functions

AssignmentTutorOnline

WAN and the physical environment

Explain how the physical surroundings of the organization influenced the WAN design that was established.

Required bandwidth

Based on the scenario provided, your estimate of the bandwidth necessary

based on predicted traffic volume and content It’s also a good idea to provide the download and upload links.

There is a need for speed.

Components of a WAN

An outline of the proposed WAN network’s main components, which comprises the

Device/software, resource type, segment/level, and functions are all factors to consider. Use the table below to help you.

Type of device/software resource

Segment/level Functions

MILCOM Communications Pty Ltd t/a MILCOM Institute | RTO 6859 | CRICOS Provider Code:03491G

Unit 12/1866 Princes Highway Clayton VIC 3168 | Phone: 1300 369 320 | Email: [email protected] Head Office: Unit 12/1866 Princes Highway Clayton VIC 3168 | Phone: 1300 369 320 | Email: [email protected]

ICTNWK517 Assessor Resource Task | v 1.0 | Last updated: May 2019 | When printed, there is no control. Page two of four

Costs and vendor options

Include at least one vendor’s alternatives and costs for each of the components you’re proposing.

three possibilities).

Segment Product Description Quantity Unit Price (ex-GST)

Design by WAN

An outline of the most appropriate WAN design, taking budget constraints into mind.

scalability and dependability

Redundant Link Design is a type of design that is used when there are several links

In the proposed WAN connectivity, a design for redundant links for link backup purposes, in

In the event that the primary connection is broken.

Scheme for IP Addressing

Include the addressing scheme for IP addresses.

Published by
Thesis
View all posts